| 1. | Hydrometeorological forecast for tgp ' s main river closure 三峡工程大江截流水文气象预报 |
| 2. | River closure under big flows in jinanqiao project construction 金安桥水电站大流量截流条件下的截流施工 |
| 3. | Second - stage river diversion and river closure construction in nierji water complex 尼尔基水利枢纽工程二期导截流施工 |
| 4. | Hydrological prototype observation of two phase river closure in nierji reservoir 尼尔基水利枢纽二期截流水文原型观测 |
| 5. | River closure of open channel and construction of rcc weir in three gorges project 三峡工程明渠截流与碾压混凝土围堰施工实践 |
| 6. | Second - phase river closure and safe advancement measures for third - phase river closure 三峡工程大江截流与明渠截流安全进占措施 |
| 7. | Analysis on river bed evolution of dam area from the main river closure to open diversion channel closure of tgp 三峡工程大江及明渠截流期间坝区河演分析 |
| 8. | Application of the numerical laboratory in river closure and diversion engineering of three gorges project is introduced 摘要介绍了三峡工程导截流水流特性数值实验室的模拟技术及其应用情况。 |
| 9. | Discusses the optimizing process of treatments of the main technical problems , which include the construction schedule , the field plan and t he balance of earth and rock works , method of the river closure and cofferdams sections , procedure and time of the river colsure , form of the cutoff , construct ion of the cut - off walls 论述了三峡大江截流及二期围堰实施过程中的施工进度计划、料场规划与土石方平衡、截流方式与围堰断面形式、截流进占程序和时段、防渗形式、防渗墙施工等主要技术问题的优化完善过程 |
| 10. | Abstract : this paper summarizes a series of tests and inve stigations on general layout , const ruction diversion , flood disposal , navigation , river closure , form of gate opening s ection , pattern of energy dissipation and scouring under sluice carried out for f eilaixia proj ect by the scientific research institute of prwrc during the period from 1983 to 1998 and presents their major results 文摘:综合阐述了珠江水利委员会科学研究所从1983 ? 1998年间对飞来峡水利枢纽的整体布置、施工导流、泄洪、通航、截流、闸孔断面形式、闸下消能形式、闸下冲刷等所进行的一系列试验和研究工作,并介绍主要试验研究成果。 |